Alexandra Quinn · January, 2013

Latest posts by Alexandra Quinn from January, 2013

Peru: Flooding of Toll Road Via Parque Rimac

  16 January 2013

At 3 am on 28th December, 2012, part of the retaining wall of the Rimac River yielded to the flood, alongside the work which was being carried out from the VIa Parque Rimac above the normal riverbed height. Here we have a chronology of events as well as reactions to what took place.